ÁÊ Êè¿âãîðáóä
 
 
 

Frame houses for three months.

...about your home and healthy life in harmony with nature,
...about living in the house,
...about life at a reasonable price and still in the short term,
...Life without excessive costs for accommodation,
...everything
           - what do you admire,
           - what you like,
           - about what you been dreaming ...


           How is this possible?     Next - Technology >>

           Prefabricated buildings on the basis of lung prefabricated modular wooden elements satisfy all the requirements for modern type of housing.

  • speed of construction
    The maximum duration of the construction of even the largest houses takes about three months. On the duration of construction will not affect winter or cold.

  • low cost
    The total cost is determined by a complete set of individual homes, manufactured on request. The lowest cost per m2 area.

  • 30 year guarantee of structural systems
    This term derives from the practical experience of proven bearing structure of the state of our first houses. Wood is a material with great durability. Proof of this is wooden houses in the mountains of the Carpathians, which stood About a hundred years.

  • Certified Buildings
    The system design meets the traditional standards of the European Community. All materials used meet the standards of environmental requirements for materials.

  • Energy thrifty
    This type of house features high thermal insulation performance. All the materials used in the walls are well insulated and thus guarantee a constant temperature environment inside the house. The house warm up much faster flow of heat is not on heating for massive walls,but only and almost exclusively on living space.

  • Best use of space
    To achieve such thermal insulation properties like has our outside wall - applying the classical technology outside wall should be several times thicker. So with our technology you can get up to 15 m2 more living space inside the home by saving on the thickness of the wall.

  • soundproofness
    Thanks to modern multi-panel design, you can not be afraid of noise in the house.

  • a wide range of model projects
    We offer a choice of about 20 typical homes and numerous options and various architectural additions.

  • variability and the possibility of individual imaginations
    Technical documentation is developed based on your individual requirements. Thus, each house becomes a unique original

  •    Manufacture and assembly

           Manufacture

    Production of selected parts of the house carried out in manufacturing plants. Here are manufactured outer walls, ceilings, partitions and all other parts through modern automatic production line. In exterior walls are inserted windows and doors, insulation and installed plasterboard.

           Assembly

    Some assembly elements are transported to the site and using a crane mounted on a plate basement. Thus, thanks to prefabricated panels by the erecting house, including all the installation work will be completed within three months.

     


            Next - Technology >>

     

     

 
News

3-6 december 2009ã.
"LTD Kievgorbud " participated in the exhibition "Wooden House Building 2009". in the expo-center "Expo-Plaza"

20 november 2009ã.
Pay attention to the page "Price" prices have changed

3 august 2009ã.
Finished working on the section "Frame House"! there appeared the draft frame houses serial type as well as describes the technology of manufacturing and assembly of a frame house

11-14 december 2008ã.
"LTD Kievgorbud " participated in the exhibition "Wooden House Building 2008". in the expo-center "Expo-Plaza"

December 2008ã
LTD "BK Kievgorbud" increases capacities... "Travel" which was included at structure of the company in November 2007, expands assortment of glued production for furniture manufacture. Rozhnjatovsky wood-processing industrial complex - one of leading enterprises of the western region, lets out an euro-bar for manufacture of windows and doors. Production spectrum is various by dry sawn and semi-finished products, windows, doors. The wide list of the adjusted equipment and the qualified structure of experts carries out production of high quality and in optimum terms.

25-29 september 2007ã.
"LTD Kievgorbud " participated in the exhibition "Wooden House Building 2007". in the expo-center "Expo-Plaza" Organizers Kyiv "ÀÊÊÎ International"

2007ã.
"LTD Kievgorbud " participated in the exhibition "Wooden House Building 2007". Rivne city Organizers Kyiv "ÀÑÄ Ðåñóðñ" and "Óêðà¿íñüêèé ë³ñîâèé ðèíîê" Rivne city...

8-10 december 2006ã.
"LTD Kievgorbud " participated in the exhibition "Wooden House Building 2006". in the expo-center "Expo-Plaza"