ÁÊ Êè¿âãîðáóä
 
 
 

price for the manufacture and construction of wooden houses and molded products from company "LTD.Kievgorbud"

 

 

 

 

Description

Completion

size,ìì

Unit of measure

Value €

 

Sets of wooden houses (base set and "turnkey")

 

basic kit

Shaped laminated board


1.walls, partitions (glued beam)

2.floor joists

3.intermediate floors

4.Rough floors

5.Rafters

6.set consumables

7.assembly

180õ160

 

100õ50

200õ150

30

150õ50

m2

190,5-286

 

 

basic kit

Round log


D 200,220mm

 

1.walls, partitions (Round log)

2.floor joists

3.intermediate floors

4.Rough floors

5.Rafters

6.set consumables

7.assembly

d-200-220

 

100õ50

200õ150

30

150õ50

m2

133,5-152,5

 

 

basic kit

Shaped Massive beams and
D-shaped beams

18% humidity

200õ170 ìì

 

1.walls, partitions (Profiled massive construction Rectangular, D-shaped)

2.floor joists

3.intermediate floors

4.Rough floors

5. Rafters

6. set consumables

7.assembly

17200

 

100õ50

200õ150

30

150õ50

m2

190,5 -220

 

 

basic kit

Prefab

1.walls, partitions

2.floor joists

3.intermediate floors

4.Rough floors

5. Rafters

6.assembly

 

 

 

m2

86-95.2

 

 

House TurnkeyShaped laminated board

 

1.Band-foundation

2. Basic wood construction

3.Roof (soft roof nbp, katepal, iko, tegola or metal tile)

4.Windows. Doors.

5.Interior finish (floor board, center-beaded board , materials of softwood)

6.Sanding, painting, wood processing.

7. Derivation of egineering - electrician (points) inside the house

 

180õ160ìì

m2

480-580

 

 

House Turnkey

Shaped Massive beams and D-shaped beams

18% humidity

200õ170 ìì

 

 

1.Band-foundation

2. Basic wood construction

3.Roof (soft roof nbp, katepal, iko, tegola or metal tile)

4.Windows. Doors.

5.Interior finish (floor board, center-beaded board , materials of softwood)

6.Sanding, painting, wood processing.

7. Derivation of egineering - electrician (points) inside the house

 

17200ìì

m2

335-430

 

 

House Turnkey

Round log

1.Band-foundation

2. Basic wood construction

3.Roof (soft roof nbp, katepal, iko, tegola or metal tile)

4.Windows. Doors.

5.Interior finish (floor board, center-beaded board , materials of softwood)

6.Sanding, painting, wood processing.

7. Derivation of egineering - electrician (points) inside the house

 

200,220ìì

m2

305 - 385

 

 

House Turnkey

Prefab

1.Band-foundation

2. Basic wood construction

3.Roof (soft roof nbp, katepal, iko, tegola or metal tile)

4.Windows. Doors.

5.Interior finish (floor board, center-beaded board , materials of softwood)

6.Sanding, painting, wood processing.

7. Derivation of egineering - electrician (points) inside the house

 

m2

286 - 385

 

 

Small architectural forms

According to the specification

 

 

 

 

Subject to change of section of wall material (logs, timber), the cost sq.m. changes in the direction of increasing or decreasing by 5-10%

 

Walling

 

Glued timber with sidetracking bowls


 

ìin section 100õ160

ìax section  200õ230

m3

430

 

 

Glued timber
without sidetracking bowls


 

ìin section 100õ160

ìax section  200õ230

m3

385

 

 

Profiled walling massive timber, Shaped Massive beams and
D-shaped beams

18% humidity

without sidetracking bowls


 

17200

 

m3

220

 

 

Shaped Massive beams and D-shaped beams

18% humidity

with sidetracking bowls

 

17200

 

m3

270

 

 

Round log


 

d-180,200, 220,240

m3

120

 

Joinery

Finishing

 

Center-beaded board, thickness.16ìì, width 115 ìì


 

 

m2.

6,5

 

 

Floor board, thickness.33 ìì, width 115 ìì


 

 

 

m2

10,5

 

 

 

Imitation of the squared beam, 156õ125


 

 

m2

10

 

 

Euro-beam, softwood, 72õ86


 

 

m3

480

 

 

Block House, 28õ115


 

 

m2

10,5

 

Lumber

 

Dry board, bar, lath

 

 

m3

175

 

 

Weatherstrip

 

 

meter

0,6

 

 

Plinth

 

 

meter

0,6

 

Glued products

             

 

elements of the door frame,pine, spruce.

 

 

m3

525

 

 

Glued beam

 

ìin section 100õ160

ìax section  200õ230

m3

382

 

Services

 

assembly of the basic set

 

 

m2

37

 

 

Wood drying

 

 

m3

contract price

 

 

 

 

 

 
News

3-6 december 2009ã.
"LTD Kievgorbud " participated in the exhibition "Wooden House Building 2009". in the expo-center "Expo-Plaza"

20 november 2009ã.
Pay attention to the page "Price" prices have changed

3 august 2009ã.
Finished working on the section "Frame House"! there appeared the draft frame houses serial type as well as describes the technology of manufacturing and assembly of a frame house

11-14 december 2008ã.
"LTD Kievgorbud " participated in the exhibition "Wooden House Building 2008". in the expo-center "Expo-Plaza"

December 2008ã
LTD "BK Kievgorbud" increases capacities... "Travel" which was included at structure of the company in November 2007, expands assortment of glued production for furniture manufacture. Rozhnjatovsky wood-processing industrial complex - one of leading enterprises of the western region, lets out an euro-bar for manufacture of windows and doors. Production spectrum is various by dry sawn and semi-finished products, windows, doors. The wide list of the adjusted equipment and the qualified structure of experts carries out production of high quality and in optimum terms.

25-29 september 2007ã.
"LTD Kievgorbud " participated in the exhibition "Wooden House Building 2007". in the expo-center "Expo-Plaza" Organizers Kyiv "ÀÊÊÎ International"

2007ã.
"LTD Kievgorbud " participated in the exhibition "Wooden House Building 2007". Rivne city Organizers Kyiv "ÀÑÄ Ðåñóðñ" and "Óêðà¿íñüêèé ë³ñîâèé ðèíîê" Rivne city...

8-10 december 2006ã.
"LTD Kievgorbud " participated in the exhibition "Wooden House Building 2006". in the expo-center "Expo-Plaza"