|
Description |
Completion |
size,ìì |
Unit of measure
|
Value € |
|
Sets of wooden houses (base set and "turnkey") |
|
basic kit

Shaped laminated board

|
1.walls, partitions (glued beam)
2.floor joists
3.intermediate floors
4.Rough floors
5.Rafters
6.set consumables
7.assembly |
180õ160
100õ50
200õ150
30
150õ50 |
m2 |
190,5-286 |
|
|
basic kit

Round log

D 200,220mm
|
1.walls, partitions (Round log)
2.floor joists
3.intermediate floors
4.Rough floors
5.Rafters
6.set consumables
7.assembly |
d-200-220
100õ50
200õ150
30
150õ50 |
m2 |
133,5-152,5 |
|
|
basic kit

Shaped Massive beams and D-shaped beams

18% humidity
200õ170 ìì
|
1.walls, partitions (Profiled massive construction Rectangular, D-shaped)
2.floor joists
3.intermediate floors
4.Rough floors
5. Rafters
6. set consumables
7.assembly |
170õ200
100õ50
200õ150
30
150õ50 |
m2 |
190,5 -220 |
|
|
basic kit

Prefab
|
1.walls, partitions
2.floor joists
3.intermediate floors
4.Rough floors
5. Rafters
6.assembly
|
|
m2 |
86-95.2 |
|
|
House TurnkeyShaped laminated board
|
1.Band-foundation
2. Basic wood construction
3.Roof (soft roof nbp, katepal, iko, tegola or metal tile)
4.Windows. Doors.
5.Interior finish (floor board, center-beaded board , materials of softwood)
6.Sanding, painting, wood processing.
7. Derivation of egineering - electrician (points) inside the house |
180õ160ìì |
m2 |
480-580 |
|
|
House Turnkey
Shaped Massive beams and
D-shaped beams
18% humidity
200õ170 ìì
|
1.Band-foundation
2. Basic wood construction
3.Roof (soft roof nbp, katepal, iko, tegola or metal tile)
4.Windows. Doors.
5.Interior finish (floor board, center-beaded board , materials of softwood)
6.Sanding, painting, wood processing.
7. Derivation of egineering - electrician (points) inside the house |
170õ200ìì |
m2 |
335-430 |
|
|
House Turnkey
Round log |
1.Band-foundation
2. Basic wood construction
3.Roof (soft roof nbp, katepal, iko, tegola or metal tile)
4.Windows. Doors.
5.Interior finish (floor board, center-beaded board , materials of softwood)
6.Sanding, painting, wood processing.
7. Derivation of egineering - electrician (points) inside the house |
200,220ìì |
m2 |
305 - 385 |
|
|
House Turnkey
Prefab |
1.Band-foundation
2. Basic wood construction
3.Roof (soft roof nbp, katepal, iko, tegola or metal tile)
4.Windows. Doors.
5.Interior finish (floor board, center-beaded board , materials of softwood)
6.Sanding, painting, wood processing.
7. Derivation of egineering - electrician (points) inside the house |
|
m2 |
286 - 385 |
|
|
Small architectural forms |
According to the specification |
|
|
|
|
Subject to change of section of wall material (logs, timber), the cost sq.m. changes in the direction of increasing or decreasing by 5-10% |
Walling |
|
Glued timber with sidetracking bowls

|
|
ìin section 100õ160
ìax section 200õ230 |
m3 |
430 |
|
|
Glued timber
without sidetracking bowls

|
|
ìin section 100õ160
ìax section 200õ230 |
m3 |
385 |
|
|
Profiled walling massive timber, Shaped Massive beams and
D-shaped beams
18% humidity
without sidetracking bowls

|
|
170õ200
|
m3 |
220 |
|
|
Shaped Massive beams and
D-shaped beams
18% humidity
with sidetracking bowls |
|
170õ200
|
m3 |
270 |
|
|
Round log

|
|
d-180,200, 220,240 |
m3 |
120 |
|
Joinery |
Finishing |
|
Center-beaded board, thickness.16ìì, width 115 ìì

|
|
|
m2. |
6,5 |
|
|
Floor board, thickness.33 ìì, width 115 ìì

|
|
|
m2 |
10,5
|
|
|
Imitation of the squared beam, 156õ125

|
|
|
m2 |
10 |
|
|
Euro-beam, softwood, 72õ86

|
|
|
m3 |
480 |
|
|
Block House, 28õ115

|
|
|
m2 |
10,5 |
|
Lumber |
|
Dry board, bar, lath |
|
|
m3 |
175 |
|
|
Weatherstrip |
|
|
meter |
0,6 |
|
|
Plinth |
|
|
meter |
0,6 |
|
Glued products |
| |
|
|
|
|
|
|
|
elements of the door frame,pine, spruce. |
|
|
m3 |
525 |
|
|
Glued beam |
|
ìin section 100õ160
ìax section 200õ230 |
m3 |
382 |
|
Services |
|
assembly of the basic set |
|
|
m2 |
37 |
|
|
Wood drying |
|
|
m3 |
contract price |
|
|